Amendment Proposals

Amendements N°Contract Ref.DescriptionProcessFile
AP-MNT-23-01Appendix 10, Point 1.17Allow the use of further measuring devicesAmendment proposal sent: 30.06.2023
End of voting period: 30.09.2023
Adoption of Proposal:
Notification re-adoption sent:
Entering into force:


AP-MNT-23-02Appendix 7
Part A Point 3.1.2 till 3.1.4
Part C 7.1. till 7.4
Return of spare parts (aligning procedures / consequences for all valuable spare parts like it already is with wheelsetsAmendment proposal sent: 30.06.2023
End of voting period: 30.09.2023
Adoption of Proposal:
Notification re-adoption sent:
Entering into force:


AP-MNT-23-03Appendix 11, Annex 4, "no picture"Annex 4 – Insert an image for "brake block shelling" damage as well as the limit values from Appendix 2 to the Construction Guidelines V - BKS (K), 3rd edition, as of 29.03.2006Amendment proposal sent: 30.06.2023
End of voting period: 30.09.2023
Adoption of Proposal:
Notification re-adoption sent:
Entering into force:


AP-MNT-23-04Appendix 10, Chapter aFor detached wagons, in accordance with Appendix 9 under maintenance, various sensitive measures which influence the fitness to run or the safety of traffic must be carried out. However, no minimum requirements are specified for the measuring instruments.Amendment proposal sent: 30.06.2023
End of voting period: 30.09.2023
Adoption of Proposal:
Notification re-adoption sent:
Entering into force:


AP-MNT-23-06Appendix 10 Point 6.3.9Checking slackened or severed tarpaulin ropes Amendment proposal sent: 30.06.2023
End of voting period: 30.09.2023
Adoption of Proposal:
Notification re-adoption sent:
Entering into force:


AP-MNT-23-07Appendix 10, Point 6.1.2 handling defective self-unloading wagons with hydraulic equipmentAmendment proposal sent: 30.06.2023
End of voting period: 30.09.2023
Adoption of Proposal:
Notification re-adoption sent:
Entering into force:


AP-MNT-23-08Appendix 10, Point 3.8.1limit value for the dimensions of the brake blockAmendment proposal sent: 30.06.2023
End of voting period: 30.09.2023
Adoption of Proposal:
Notification re-adoption sent:
Entering into force:


AP-MNT-23-09Appendix 10 - modularisation General section introducing modules in Appendix 10Amendment proposal sent: 30.06.2023
End of voting period: 30.09.2023
Adoption of Proposal:
Notification re-adoption sent:
Entering into force:


AP-MNT-23-10Appendix 10 - modularisation M00.001: Keeper instructions to be obtainedAmendment proposal sent: 30.06.2023
End of voting period: 30.09.2023
Adoption of Proposal:
Notification re-adoption sent:
Entering into force:


AP-MNT-23-11Appendix 10 - modularisation M01.001: Wheelset removal/installationAmendment proposal sent: 30.06.2023
End of voting period: 30.09.2023
Adoption of Proposal:
Notification re-adoption sent:
Entering into force:


AP-MNT-23-12Appendix 10 - modularisation M01.002: EVIC Inspection for axlesAmendment proposal sent: 30.06.2023
End of voting period: 30.09.2023
Adoption of Proposal:
Notification re-adoption sent:
Entering into force:


AP-MNT-23-13Appendix 10 - modularisation M01.003: Handling of wagons after signs of thermal overload of wheelsetsAmendment proposal sent: 30.06.2023
End of voting period: 30.09.2023
Adoption of Proposal:
Notification re-adoption sent:
Entering into force:


AP-MNT-23-14Appendix 10 - modularisation M01.005: Cleaning the faces of the tyres or rimsAmendment proposal sent: 30.06.2023
End of voting period: 30.09.2023
Adoption of Proposal:
Notification re-adoption sent:
Entering into force:


AP-MNT-23-15Appendix 10 - modularisation M02.001: Leaf-spring suspension removal/installationAmendment proposal sent: 30.06.2023
End of voting period: 30.09.2023
Adoption of Proposal:
Notification re-adoption sent:
Entering into force:


AP-MNT-23-16Appendix 10 - modularisation M02.002: Insert buckle bossAmendment proposal sent: 30.06.2023
End of voting period: 30.09.2023
Adoption of Proposal:
Notification re-adoption sent:
Entering into force:


AP-MNT-23-17Appendix 10 - modularisation M02.003: Suspension links removal/installationAmendment proposal sent: 30.06.2023
End of voting period: 30.09.2023
Adoption of Proposal:
Notification re-adoption sent:
Entering into force:


AP-MNT-23-18Appendix 10 - modularisation M03.001: Brake function testAmendment proposal sent: 30.06.2023
End of voting period: 30.09.2023
Adoption of Proposal:
Notification re-adoption sent:
Entering into force:


AP-MNT-23-19Appendix 10 - modularisation M04.001: Axle-guard tie removal/assemblyAmendment proposal sent: 30.06.2023
End of voting period: 30.09.2023
Adoption of Proposal:
Notification re-adoption sent:
Entering into force:


AP-TTI-23-08Appendix 11, Pt 2.7Pictogramm for tank capacity in liter Appendix 11 point 2.7Amendment proposal sent: 30.06.2023
End of voting period: 30.09.2023
Adoption of Proposal:
Notification re-adoption sent:
Entering into force:


AP-TTI-23-09Appendix 11, Pt 3.2The data described under point 3.2 in Appendix 11 are not correct and do not agree with UIC IRS 50596-6Amendment proposal sent: 30.06.2023
End of voting period: 30.09.2023
Adoption of Proposal:
Notification re-adoption sent:
Entering into force: