AP-MNT-23-01 | Appendix 10, Point 1.17 | Allow the use of further measuring devices | Amendment proposal sent: 30.06.2023
End of voting period: 30.09.2023
Adoption of Proposal:
Notification re-adoption sent:
Entering into force: |

|
AP-MNT-23-02 | Appendix 7
Part A Point 3.1.2 till 3.1.4
Part C 7.1. till 7.4 | Return of spare parts (aligning procedures / consequences for all valuable spare parts like it already is with wheelsets | Amendment proposal sent: 30.06.2023
End of voting period: 30.09.2023
Adoption of Proposal:
Notification re-adoption sent:
Entering into force: |

|
AP-MNT-23-03 | Appendix 11, Annex 4, "no picture" | Annex 4 – Insert an image for "brake block shelling" damage as well as the limit values from Appendix 2 to the Construction Guidelines V - BKS (K), 3rd edition, as of 29.03.2006 | Amendment proposal sent: 30.06.2023
End of voting period: 30.09.2023
Adoption of Proposal:
Notification re-adoption sent:
Entering into force: |

|
AP-MNT-23-04 | Appendix 10, Chapter a | For detached wagons, in accordance with Appendix 9 under maintenance, various sensitive measures which influence the fitness to run or the safety of traffic must be carried out. However, no minimum requirements are specified for the measuring instruments. | Amendment proposal sent: 30.06.2023
End of voting period: 30.09.2023
Adoption of Proposal:
Notification re-adoption sent:
Entering into force: |

|
AP-MNT-23-06 | Appendix 10 Point 6.3.9 | Checking slackened or severed tarpaulin ropes | Amendment proposal sent: 30.06.2023
End of voting period: 30.09.2023
Adoption of Proposal:
Notification re-adoption sent:
Entering into force: |

|
AP-MNT-23-07 | Appendix 10, Point 6.1.2 | handling defective self-unloading wagons with hydraulic equipment | Amendment proposal sent: 30.06.2023
End of voting period: 30.09.2023
Adoption of Proposal:
Notification re-adoption sent:
Entering into force: |

|
AP-MNT-23-08 | Appendix 10, Point 3.8.1 | limit value for the dimensions of the brake block | Amendment proposal sent: 30.06.2023
End of voting period: 30.09.2023
Adoption of Proposal:
Notification re-adoption sent:
Entering into force: |

|
AP-MNT-23-09 | Appendix 10 - modularisation | General section introducing modules in Appendix 10 | Amendment proposal sent: 30.06.2023
End of voting period: 30.09.2023
Adoption of Proposal:
Notification re-adoption sent:
Entering into force: |

|
AP-MNT-23-10 | Appendix 10 - modularisation | M00.001: Keeper instructions to be obtained | Amendment proposal sent: 30.06.2023
End of voting period: 30.09.2023
Adoption of Proposal:
Notification re-adoption sent:
Entering into force: |

|
AP-MNT-23-11 | Appendix 10 - modularisation | M01.001: Wheelset removal/installation | Amendment proposal sent: 30.06.2023
End of voting period: 30.09.2023
Adoption of Proposal:
Notification re-adoption sent:
Entering into force: |

|
AP-MNT-23-12 | Appendix 10 - modularisation | M01.002: EVIC Inspection for axles | Amendment proposal sent: 30.06.2023
End of voting period: 30.09.2023
Adoption of Proposal:
Notification re-adoption sent:
Entering into force: |

|
AP-MNT-23-13 | Appendix 10 - modularisation | M01.003: Handling of wagons after signs of thermal overload of wheelsets | Amendment proposal sent: 30.06.2023
End of voting period: 30.09.2023
Adoption of Proposal:
Notification re-adoption sent:
Entering into force: |

|
AP-MNT-23-14 | Appendix 10 - modularisation | M01.005: Cleaning the faces of the tyres or rims | Amendment proposal sent: 30.06.2023
End of voting period: 30.09.2023
Adoption of Proposal:
Notification re-adoption sent:
Entering into force: |

|
AP-MNT-23-15 | Appendix 10 - modularisation | M02.001: Leaf-spring suspension removal/installation | Amendment proposal sent: 30.06.2023
End of voting period: 30.09.2023
Adoption of Proposal:
Notification re-adoption sent:
Entering into force: |

|
AP-MNT-23-16 | Appendix 10 - modularisation | M02.002: Insert buckle boss | Amendment proposal sent: 30.06.2023
End of voting period: 30.09.2023
Adoption of Proposal:
Notification re-adoption sent:
Entering into force: |

|
AP-MNT-23-17 | Appendix 10 - modularisation | M02.003: Suspension links removal/installation | Amendment proposal sent: 30.06.2023
End of voting period: 30.09.2023
Adoption of Proposal:
Notification re-adoption sent:
Entering into force: |

|
AP-MNT-23-18 | Appendix 10 - modularisation | M03.001: Brake function test | Amendment proposal sent: 30.06.2023
End of voting period: 30.09.2023
Adoption of Proposal:
Notification re-adoption sent:
Entering into force: |

|
AP-MNT-23-19 | Appendix 10 - modularisation | M04.001: Axle-guard tie removal/assembly | Amendment proposal sent: 30.06.2023
End of voting period: 30.09.2023
Adoption of Proposal:
Notification re-adoption sent:
Entering into force: |

|
AP-TTI-23-08 | Appendix 11, Pt 2.7 | Pictogramm for tank capacity in liter Appendix 11 point 2.7 | Amendment proposal sent: 30.06.2023
End of voting period: 30.09.2023
Adoption of Proposal:
Notification re-adoption sent:
Entering into force: |

|
AP-TTI-23-09 | Appendix 11, Pt 3.2 | The data described under point 3.2 in Appendix 11 are not correct and do not agree with UIC IRS 50596-6 | Amendment proposal sent: 30.06.2023
End of voting period: 30.09.2023
Adoption of Proposal:
Notification re-adoption sent:
Entering into force: |

|